1. Before use, add 3-5% of the curing agent, stir evenly and set aside. It can be appropriately increased in humid weather.
2. The application of glue should be uniform and consistent in thickness to avoid insufficient or excessive glue. The second application can only be made after the first glue has dried.
3. After the adhesive film dries, strive to align and adhere it in one go within the adhesive retention time of the film. Select the appropriate pressure and application time based on the shoe type.
4. Process flow:
The direction of the assembly line → apply the first glue at 60℃ to 70℃(3min-6min) → Apply the second glue at 60℃ to 70℃(3min-6min) → lamination → apply pressure
If necessary, the shoe materials should be sanded before gluing
1. When in use, avoid direct fan blowing, otherwise it is easy to cause surface skilling, which will affect the brushing and bonding effect.
2. The gluing brush should be kept clean and soft. The brush for PU glue should be soaked and cleaned with MEK(methyl ethyl ketone).
3. After the new goods arrive, customers must clear and use them first to avoid the accumulation of old daily goods.
The prepared adhesive should be used up within 2 to 4 hours.
The viscosity index may be adjusted as necessary due to climate and customer requirements, etc., for reference only.
All oral or written suggestions are correct to the best of our knowledge, but this does not mean that users can be relieved of the responsibility to verify our suggestions and products.
1. Before use, add 3-5% of the curing agent, stir evenly and set aside. It can be appropriately increased in humid weather.
2. The application of glue should be uniform and consistent in thickness to avoid insufficient or excessive glue. The second application can only be made after the first glue has dried.
3. After the adhesive film dries, strive to align and adhere it in one go within the adhesive retention time of the film. Select the appropriate pressure and application time based on the shoe type.
4. Process flow:
The direction of the assembly line → apply the first glue at 60℃ to 70℃(3min-6min) → Apply the second glue at 60℃ to 70℃(3min-6min) → lamination → apply pressure
If necessary, the shoe materials should be sanded before gluing
1. When in use, avoid direct fan blowing, otherwise it is easy to cause surface skilling, which will affect the brushing and bonding effect.
2. The gluing brush should be kept clean and soft. The brush for PU glue should be soaked and cleaned with MEK(methyl ethyl ketone).
3. After the new goods arrive, customers must clear and use them first to avoid the accumulation of old daily goods.
The prepared adhesive should be used up within 2 to 4 hours.
The viscosity index may be adjusted as necessary due to climate and customer requirements, etc., for reference only.
All oral or written suggestions are correct to the best of our knowledge, but this does not mean that users can be relieved of the responsibility to verify our suggestions and products.